Start with the current drawing set

Issue the architectural drawings, specifications and the latest addenda together. Elevations and door schedules establish the visible scope, while wall sections and details explain how the glazing connects to the surrounding envelope and finishes.

If a package is still developing, identify which sheets are preliminary. That lets the estimator state allowances and exclusions instead of treating incomplete details as final.

Define the tender conditions

Include the bid closing date, project location, construction schedule, bonding or insurance requirements and the preferred quotation format. Site access, floor-by-floor sequencing and after-hours work can materially affect installation planning.

  • Project name, address and general contractor contact
  • Bid deadline and expected construction dates
  • Applicable addenda and alternate prices
  • Required breakdowns, unit rates or cash allowances

Call out scope boundaries

Commercial glazing often interfaces with doors, hardware, air and vapour barriers, flashings, blocking, electrical access control and finished openings. The bid package should make responsibility for these items as clear as possible.

For multi-residential work, provide suite counts and a typical unit matrix for shower doors and mirrors. Repetition improves efficiency only when unit types, dimensions and release sequences are coordinated.

Leave time for questions

A short question period before closing gives the glazing contractor time to review conflicts and request clarification. The result is a quotation that is easier for the GC to level against competing bids and carry into the project budget.